2008 Terminal Apron and Taxiway Improvements
Location: Bellingham, WA
Owner: Port of Bellingham
Engineer: Port of Bellingham
Project Status: Completed
Project Description:
- Construct a Taxilane between Taxiway H & J
- Construction a deicing collection system
- Complete pavement maintenance of the south 1750 ft. of Runway 16-34, by crack filling.
- Fire Truck Access Road from the ARFF Station to Taxiway A
- Reconstruct the existing asphalt terminal apron with Portland Cement Concrete south of the existing PCC terminal apron
- Reconstruct the existing asphalt terminal apron with Portland Cement Concrete North of the existing PCC terminal apron
- Reconstruct Taxiway E between the Main Terminal Apron and Taxiway A
- Reconstruct Taxiway C between Runway 16-34 and Taxiway A