Corporate Headquarters
2116 Buchanan Loop
Ferndale, WA 98248
Phone: (360) 671-3936
Fax: (360) 671-8808
WA License No. IMCOGI*215R1

Featured Project

Airway Heights Water Reclamation Plant, Phase1B

Location: Airway Heights, WA
Owner: City of Airway Heights
Contract Amount: $26,836,095.00
Anticipated Completion: September 2011

Engineer:Century West Engineering Corporation, Esvelt Environmental Engineering, Trindera, Structural Research
Contract Duration: 730 Calendar Days





Project Description:

The project aims to be the first facility in Washington to treat wastewater to class A-plus water reclamation and reuse standards and replenish crucial groundwater supplies. Construction of the facility is occurring in two phases, at times simultaneously. Phase B is underway and includes construction of a new headworks building, final treatment building, dewatering building, a RAS/WAS pumping building; a short term covered storage lagoon, a storage tank, an influent pump station, and various miscellaneous site work.

Featured Projects I Safety & Awards I News I Subcontractors I Contact Us I Employment
2011 Copyright Imco General Construction Inc. All rights reserved